Products
Workwear
Detachable-Lined Winter Work Jacket in Navy/Red, Grey/Orange with 280g Cotton Fill
Detachable-Lined Winter Work Jacket in Navy/Red, Grey/Orange with 280g Cotton Fill
Detachable-Lined Winter Work Jacket in Navy/Red, Grey/Orange with 280g Cotton Fill
Detachable-Lined Winter Work Jacket in Navy/Red, Grey/Orange with 280g Cotton Fill
Detachable-Lined Winter Work Jacket in Navy/Red, Grey/Orange with 280g Cotton Fill
Detachable-Lined Winter Work Jacket in Navy/Red, Grey/Orange with 280g Cotton Fill

Detachable-Lined Winter Work Jacket in Navy/Red, Grey/Orange with 280g Cotton Fill

Built for versatility in cold industrial settings, this mid-length work jacket uses full-process TC80/20 (80% polyester, 20% cotton) heavy twill fabric—durable, wrinkle-resistant, and breathable. The 280g long-staple cotton inner liner attaches via classic horn buttons and is fully removable for seasonal flexibility. Popular veste de travail hiver amovible in Europe, available in navy/red, navy/yellow, and grey/orange for enhanced visibility or corporate branding.

Related Products
Product Details Description

Ideal for logistics, construction, and municipal services across North America and Australia, this jacket combines practicality with style. Choose from six dual-tone combinations—including navy/green, navy/grey, and red/navy—to match team identity or safety requirements. The chaqueta de trabajo con forro desmontable offers year-round wearability thanks to its rugged T/C80/20 shell and cozy 280g cotton insulation.

 

FAQ

1. Are you a manufacturing or trading company?
Yiwu Chenyuan, a manufacturing and trading combination, has been producing and exporting raincoats for over 19 years. We have a professional sales team.
2. Can you provide free samples? What is the sampling time?
As a first-time cooperation, we will charge a small sample fee as your design setup cost. This fee is refundable after order confirmation. Samples can be sent to you within 7-10 days.
3. What are your payment terms?
T/T: 30% deposit, 70% balance against copy of bill of lading.
4. How long is your production time?
ETD: Within 30-45 days after order confirmation.
5. How does your factory control quality?
I. We have a strict quality control system from approving each material to completing the umbrella.
II. Before production, a pre-production sample will be made for sales approval. At every step of production, we conduct strict online QC inspections.
III. After the goods are finally packed in cartons, our quality control staff will inspect the goods and send you a report.

Contact Us
MESSAGE BOARD